full screen
Main facility: Platform (Closed)
Lines: Westby Branch
Location: line-map     (147.3857°, -35.4388°) GDA94
Distance: 585.100 km from Sydney
History:
5-Aug-1925 Opened as Pullitop
8-May-1932 Renamed Pulletop
24-Jan-1952 Closed
Photos: 1934, 1994, 2000
Description: Opened with just a down side loading bank and siding. Later a 30m platform was added on the up side.
Current status: The concrete-faced loading bank still remains. The right of way is now used as an access track to a nearby property.

Photographs

photograph thumbnail   photograph thumbnail   photograph thumbnail  

Diagrams

1925:
location diagram